冷再生機(jī)租賃廠家施工準(zhǔn)備工作
來源:http://www.xintangt.com/ 日期:2022-03-15
冷再生機(jī)租賃廠家在道路施工前要做好充分的準(zhǔn)備工作,才能保障整個施工過程的順利進(jìn)行,需要做好哪些準(zhǔn)備工作呢?
The leasing manufacturer of cold regenerator should make full preparations before road construction in order to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立嚴(yán)謹(jǐn)、規(guī)范的內(nèi)部約束、考核、激勵機(jī)制,用制度管人,用規(guī)章管理工程。
1. We should establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with rules.
2、要補(bǔ)充調(diào)查工程沿線影響施工的因素,標(biāo)注出平面位置圖,并進(jìn)行、論證,寫出調(diào)查報(bào)告,作為修訂施工方案、編制施工控制預(yù)算的依據(jù)。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設(shè)計(jì)意圖,澄清圖紙中的問題,恢復(fù)定線和施工放樣。對所有控制點(diǎn)進(jìn)行加密、保護(hù)、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場調(diào)研認(rèn)真編制施工控制預(yù)算,作為控制支出、進(jìn)行成本預(yù)測分析、經(jīng)濟(jì)核算以及統(tǒng)計(jì)工程進(jìn)度的依據(jù)。
4. Carefully prepare the construction control budget according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生機(jī)出租
Rental of cold regenerator
5、進(jìn)行業(yè)務(wù)、技術(shù)培訓(xùn)和技術(shù)交底,使相關(guān)人員對工程的技術(shù)標(biāo)準(zhǔn)、操作規(guī)程、質(zhì)量控制、資料整理有全面的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地試驗(yàn)室,并申請臨時資質(zhì)。對施工中擬使用的各種原材料取樣試驗(yàn),建立相關(guān)技術(shù)參數(shù)的數(shù)據(jù)庫。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in construction, and establish a database of relevant technical parameters.
7、繪制關(guān)鍵工序施工工藝流程圖和試驗(yàn)操作規(guī)程、質(zhì)量檢查評定、計(jì)量支付、設(shè)計(jì)變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術(shù)標(biāo)準(zhǔn)、機(jī)械設(shè)備能力、材料供應(yīng)、自然條件等進(jìn)行綜合分析,選擇Z佳施工方案,完善施工組織設(shè)計(jì)。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., conduct comprehensive analysis, select the z-best construction scheme and improve the construction organization design.
  • 上一條:冷再生機(jī)在道路深翻中有什么優(yōu)勢?
  • 下一條:冷再生機(jī)為何使用那么頻繁?
  • 欧美又大又粗无码视频| 国产在线 | 日韩| 女m被主人虐玩调教小说| 亚洲精品久久久久一区二区三区| 亚洲av成人无码久久精品老人| 国产麻豆精品一区二区三区| 国产综合久久久久久精品| 12末发育娇小性色xxxx| 妻子的背叛完整版视频| 特大黑人巨交吊性xxxx| 精品久久久久久中文字幕人妻最新| 被三个男人绑着躁我好爽| 18禁美女黄网站色大片免费看| 无码人妻精品一区二区三区99| 在线香蕉精品视频| 欧美18videosex性欧美| 久久综合亚洲欧美成人| 久久天天躁狠狠躁夜夜免费观看| 狠狠躁夜夜躁人爽碰| 久久人人爽人人爽人人片DVD| 沧元图动漫全集免费观看高清| 孩交精品xxxx视频视频| 日本人真人爱视频全部过程| 好湿好紧水多AAAAA片秀人网| 国产精品色欲AV亚洲三区| 人妻夜夜爽天天爽三区麻豆av| 公交车上拨开丁字裤进入电影| 疯狂做受xxxx高潮欧美日本| 中文字幕无码他人妻味| 高潮搐痉挛潮喷av| 色喜国模私密浓毛私拍人体图片| 小妖精抬起臀嗯啊h军人| 男女做爰的全部过程a片| 肥猫寻亲记第二部| b站直播入口| 亚洲A∨精品一区二区三区下载| 亲爱的老师4韩剧免费观看| 精品久久久无码人妻字幂| 无码免费一区二区三区免费播放| 苍井空与黑人90分钟全集| 天天澡天天狠天干天啪啪|